Commercial Gallery

In the CMP.

New London, CT

In the CMP. In the CMP.

Lifting the Tower.

S. Burlington, VT

Lifting the Tower. Lifting the Tower.

Building Forms.

S. Burlington, VT

Building Forms. Building Forms.

Protecting Bolts.

Jackman, ME

Protecting Bolts. Protecting Bolts.

Pulling Shoring.

Warwick, RI

Pulling Shoring. Pulling Shoring.

Moving the CMP.

New London, CT

Moving the CMP. Moving the CMP.

Lifting the Bolt Cage.

Warwick, RI

Lifting the Bolt Cage. Lifting the Bolt Cage.

Etching the Bolts.

S. Burlington, VT

Etching the Bolts. Etching the Bolts.

Preparing the Bolt Cage.

S. Burlington, VT

Preparing the Bolt Cage. Preparing the Bolt Cage.

Finished Foundation.

S. Burlington, VT

Finished Foundation. Finished Foundation.

Heavy Equipment.

S. Burlington, VT

Heavy Equipment. Heavy Equipment.

Final Touches.

S. Burlington, VT

Final Touches. Final Touches.

In the Bolt Cage.

Warwick, RI

In the Bolt Cage. In the Bolt Cage.

Bolt Cage.

Warwick, RI

Bolt Cage. Bolt Cage.

Site Work.

S. Burlington, VT

Site Work. Site Work.

Plumbing the Cage.

S. Burlington, VT

Plumbing the Cage. Plumbing the Cage.

20’ Bolts.

Warwick, RI

20’ Bolts. 20’ Bolts.

Preparing the Form.

New London, CT

Preparing the Form. Preparing the Form.

Running Conduit.

Jackman, ME

Running Conduit. Running Conduit.

Road Building.

Jackman, ME

Road Building. Road Building.